Channel Tunnel Maintenance!
Posted: 03 May 2019, 13:31
"Eurotunnel Engineering Works on 20-23 September 2019
On this weekend, we've currently stopped selling tickets on trains running from 18:00 on Friday evening until 07:00 on Monday morning.
This is because of planned electric cable installation works to in the Channel Tunnel which will mean that we'll only be able run trains through one of the two tunnels we normally use.
Once our timetables for these days have been amended and tickets are available to book again, we'll announce the details here and also on our Twitter page."
FMFL!
Marge xxx
That's potentially fewer trains on Sunday 22nd or potential delays on 23rd if anyone going over from London gigs..
M
On this weekend, we've currently stopped selling tickets on trains running from 18:00 on Friday evening until 07:00 on Monday morning.
This is because of planned electric cable installation works to in the Channel Tunnel which will mean that we'll only be able run trains through one of the two tunnels we normally use.
Once our timetables for these days have been amended and tickets are available to book again, we'll announce the details here and also on our Twitter page."
FMFL!
Marge xxx
That's potentially fewer trains on Sunday 22nd or potential delays on 23rd if anyone going over from London gigs..
M